project name: Innovative CO2 Capture
Framework Programme: FP7 programme area: Energy
contract/proposal/call number: 241393
status: active
start date: January 2010 duration: 48 months projected finish date: January 2014
total budget: € 6,059,393
Note that the follow people may not represent the full extent of the consortium. FEAST has tried to identify the Australian participants, and their collaborators (or coordinator), within the project. Also note that Australian participation may not necessarily be on a formal level. Further details about the partners in this project can be found at the website listed below.
| name | organisation | state or country |
|---|---|---|
| CSIRO | Australia |
WWW: cordis.europa.eu/search/index.cfm?fuseaction=proj.document&PJ_RCN=11018576
summary:
In post-combustion CO2 capture, a main bottleneck causing significant reduction in power plant efficiency and preventing cost effectiveness is the low flue gas CO2 partial pressure, limiting membrane flux, solvent selection and capacity. In pre-combustion CO2 capture, key bottlenecks are number of processing steps, possible low hydrogen pressure, and high hydrogen fraction in the fuel Global deployment of CO2 capture is restrained by a general need for prior removal of SO2. iCap seeks to remove these barriers by developing new technologies with potential for reducing the current energy penalty to 4-5% points in power plant efficiency, to combine SO2 and CO2 removal, and to reduce the avoidance cost.